Last year Deep End Pools were the first company to install one of Certikin North’s pioneering ‘Ultra Liners’ and today at the Certikin Seminar they were formally introduced to the trade.
The benefits of the new ultra liner system are an increased thickness 35 thou, (standard liners are 30 thou). The real benefit is that the tileband has 400% more lacquer than a traditional bag liner. A tradional only has one coat but the Ultra liner has 4 coats! This is really beneficial to allow for maximium tileband finish for a lot longer than your standard liner.
Of course with the liner being of a far better quality this improves the warranty as well. A normal bag liner has a really strong warranty at 5 limited year. The new Ultra Liner has a 7 year limited warranty.
Deep End Pools installation pictures were used as we are the only company who has used this brand new much better liner system. We pride ourselves on again being leaders in the swimming pool advancements and always trying the lastest and newst products.
Deep End Pools Ultra Liner Installation before it was avaliable in the catalogue.
For more information on liner installation call 01494 671787 or info@deependpools.co.uk
Deep End Pools have formed a good working relationship over the past few years with Neil and the team at Certikin North in Leeds. The Certikin North division supplies Deep End Pools with Liners and Covers and is fast becoming the top supplier in the country with their relentless developments and advancements in swimming pool covers and swimming pool liners.
Certikin North have released for the 2010 and season a range of liner accessories and modifications to either spruce up or revive an old but not yet finished liner.
TOPBORDER Self Adhesive Tile bands are a range of self adhesive borders that will bring the most faded of liner tile bands and tide lines back to life and give them a fresh breathe of life. The Top Border comes in a roll of self adhesive foil that would go round a normal 30’ x 15’ pool. The tile bands are available in many colours and designs and are very simple for a DIY installation.
Once you have refreshed your swimming pools tile band why not install a Pool Decor Graphic. Pool Decor Graphics are a range of very detailed swimming pool floor transfers.
They work on pools of lined, tiled or fibre glass finish. There are a range of 20 graphics available from patterns, sharks, dolphins or butterflies.
Pool Decors are supplied in a box ready to simply be rolled out and then simply laid flat on the swimming pools floor. The Pool Decor transfers can be installed in under 15 mins!
If you are not totally happy with the new Pool Decor you can simply peal it off of the floor and relay it in a different location as no glue or adhesive is used or required.
Certikin North have provided Deep End Pools with a whole host of solutions to your liner problems for 2010.
For more detail 01494 681835 or sales@deependpools.co.uk
Deep End Pools are refurbishing a swimming pool in Pinner, Uxbridge, Middlesex.
The swimming pool is being treated to new liner, pipework and some much needed TLC. The pool was emptied and the liner removed and disposed of.
The images show the Deep End Pools team measuring up for a very specialist liner. The pool has a Silhouette of its roman end at the deep end of the swimming pool. The liner will be a top quality liner from Certikin North. The refurbishment works will be complete by the time the new liner arrives on site to allow the pool to be fitted with its new liner and up and running within a few days.
The client was very wise in choosing winter for the refurbishment works as this will not be disrupting the normal summer swimming routine.
Call Deep End Pools now for swimming pool refurbishment : 01494 671787

Winter is the best time for swimming pool refurbishment. Deep End Pools are currently refurbishing a number of swimming pools as the works in the winter time offer minimal disruption to swimming pool usage and to gardens, as you have all spring to reinstate.
Deep End Pools have just installed a certikin swimming pool liner, into a 20 year old lincoln pool, in Gregories Road, Beaconsfield Buckinghamshire.
The refurbishment involved new PVC pipe runs as the line failed a specialist pressure test that found leaks in two lines.
Certikin Pool Fittings and a Certikin Swimming Pool liner. You can see that a lot of time and effort has been used to keep the pool area as original as possible. The paving has been carefully lifted and re-instated.
The swimming pool has been fully refurbished and will give the owner a whole new lease of life and many years of trouble free swimming.
For swimming pool refurbishment call 01494 671787 now.
Swimming pool refurbishment Beaconsfield, Gerrards Cross, Denham, Chalfont, Maidenhead, Taplow, Dorney, Cavisham, Reading, Twyford, Wargrave, Wentworth, Buckinghamshire, Berkshire, London
Deep End Pools installed a a pioneering new Liner from the UK’s top manufacturer Certikin North.
The new ’Ultra Liner’ is far superior to existing bag liners avaliable on the market.
Deep End Pools top liner installers jumped at the opertunity to try out the new liner system. The benefits of the new liner system are an increased thickness 35 thou, (standard liners are 30 thou). The real benefit is that the tileband has 400% more lacquer than a traditional bag liner. A tradional only has one coat but the Ultra liner has 4 coats! This is really beneficial to allow for maximium tileband finish for a lot longer than your standard liner.
Of course with the liner being of a far better quality this improves the warranty as well. A normal bag liner has a really strong warranty at 5 limited year. The new Ultra Liner has a 7 year limited warranty.
We honoured to have Certikin North’s Top Man Neil Stephenson join us for the installation. This is the first installation of the new system and he joined Deep End Pools to get a first hand perspective of the installation.
Liner being rolled out by Deep End Pools Nick and Neil.
Nick and Neil clipping the liner into place.
Neil from Certikin North having a better look at how to install a liner round a built in step.
Liner in place
The proud team after a top install of a ‘Ultra Liner’. (Note shoes are removed)
Liner installation call Deep End Pools 01494 671787
Deep End Pools have installed a Certikin liner in a new build swimming pool in Burnham, Berkshire.
The liner was installed and now the pool is filling ready for it to be in used in just a few days. The next step will be to cut out the fittings through the liner once the pool has enough water in the there to hold the liner in its final position. The plantroom has been plumbed up ready for commissioning.
The swimming pool construction in Burnham, Berkshire in nearly ready to be completely handed over to it’s lucky new owners.
The Swimming Pool once filled will be turned on for the first time as soon as the the pool has been filled up to the correct level. The swimming pool system will primed up and wet tested under the watch full eye of our engineers.
If you would like a New Swimming Pool installed call 01494 671787 now.
The finished product is carefully rolled and packed in a reinforced drum in order that handling on site to the pool side is as easy as possible.
The range of pattern designs available from Certikin is extensive to say the least. All materials are sourced from the world’s leading suppliers of printed vinyl and are specifically formulated to suit the pool environment. Our range offers everything from plain colours and traditional concepts to which a variety of tile-bands can be affixed, to more contemporary designs which include a pre-printed tile-bands and an array of wall and floor colours and patterns.
When ordering your liner, remember that Certikin offer a full range of additional items, such as underlay felts and foams, adhesives and liner locks; everything that is needed to do the job.
If you are replacing and old liner, your new purchase will transform your pool instantly! For the finishing touch don’t forget to replace the existing pool fittings with fresh, clean ones – these will complement your new liner perfectly.
Finally, remember to tell us if you have a step section in your pool. We will do our best to place the closing wall seam central to where the step is positioned in order that the seam is cut out and you have a continuous wall piece.
If you are looking to get your liner replaced or are installing new swimming pool liner please call 01494 671787 now to arrange for a site survey.
sales@deependpools.co.uk
Deep End Pools are able to install liners on all pools. The past season we have come up againest concrete pools, steel panel pools, polymer panel pools, formworks pools and just about every other style. We have also come up againest are fair share of shaped pools from rectangle with a flat bottom, Oval with a hopper and even an L shaped pool.
The pools have been dotted all around the area but mainly, Beaconsfield, Gerrards Cross, Farnham Common, Amersham, Cookham, Maidenhead, Reading, High Wycombe and Oxford.
The Guys have installed well over 50 liners this year, The guys are starting to think they can fit them in their sleep!
The hardest liner we have had to fit this year has not been on a monster 40′ x 20′ by 10′ deep pool. It was in fact on this pool here
The pool is around 20 year old cascade pool.
The liner as you can see has several different twists and turns to contend againest. If the shape of the pool was not enough the floor and walls are extremely ‘undulating’. The guy’s were really againest the odds. Liners in general started by locating the corners and squaring the material up. With a kidney shaped pool the liner is one large corner, with no start or finish.
The liner was put into position and kicked into place. Liners in are normally made a little bit too small and strectched into place. With the cascade style pool the coping stone is the liner lock as well. As soon as the guys were getting a section in place and strecthing the liner into place the old coping stone would ‘pop’ off.
With lots of perserverence and a little elbow grease the liner was into correct position and left to fill up to the first set of fittiings.
We take are hats of to the hard work and effort from the guy’s that made the liner fit perfectly.
If you would like Deep End Pools to install you a new liner please call 01494 671787 now!
sales@deependpools.co.uk
http://www.deependpools.co.uk/shop/gbu0-catshow/swimmingpoolliners.html
Swimming pool liners for in ground swimming pools, really are the decorative finish to any swimming pool, a good thicker gauge liner really ought to be able to last 10-15 years on average, with many factors of wear being taken into account:
Temperature
Chemicals
Usage
Exposed sunlight periods
We have experienced many pool owners with liners heading into the age of around 25 years! Of course for this to happen you really ought to be a stickler when it comes to water chemistry and temperature control!
All swimming pool liners are tailored to suit your swimming pool, as the variables within the swimming pool shells vary massively never is one swimming pool liner the same as another on an in ground pool.
When is the best time to change a swimming pool liner?
Well the fitting temperature and outside ambient temperatures have a huge factor when it comes to liner fitment, for instance in 2006 when the day time temperatures were heading into the 90’s the temperature was simply too hot to install liners in and around the Buckinghamshire areas, the weight of the liner on the wall sections pulling and stretching the liner beyond the permitted tolerances, so during this period we installed all swimming pool liners either first thing in the morning or last thing at night when the temperatures, however in 2007 and 2008 when the outside ambient temperatures were slightly lower we choose to use two suction fans per liner installation to help pull the liners into the shell tighter as less stretch was available due to low ambient temperatures.
We would advise the best time for a liner to be installed would be between late February and Late October when outdoor and any time on an indoor liner change. whenever you are looking to install any liner in a high water table area such as Denham, Farnham Common, Marlow, Burnham Beeches and Aylesbury more areas we can advise upon due to our experience in these areas, the perfect time dependent upon the years weather is often late summer and the early autumn periods.
How much will a swimming pool liner change cost me?
well the fact is in ground swimming pool liners are far easier to install than above ground swimming pool liners, however good consideration must be taken into account for small light floor repairs gaskets and faceplates and liner lock repairs roman end gaskets under water light inspections.
an average swimming pool liner change inclusive of chemicals labour materials and the liner really ought to come in around 2-3k mark anything much less than this then please ensure the specification is comparable as economies can be made on a service that takes 2-3 days to install and something that should then last 10-15 years.
Preparation preparation preparation
one area savings can be made is the preparation, all metal panels should be flatted off and rubbed down, floor areas touched up and treated, plastic fittings cleaned and ready for gaskets. Preparation really is the key, 2-6 hours often being the average preparation for a swimming pool pvc liner is normal, of course this can depend upon the builder of the swimming pool in the first instance.
Call either:
01628 666294 Taplow maidenhead office and swimming pool shop
01494 671787 Beaconsfield Head Office and Swimming pool shop
Deep End Pools
Deep End Pools carry out liner change services in a vast coverage of areas to include: Henley on Thames, Medmenham, Bix, Nettlebed, Nuffield, Remenham hill, Wargrave, Hurley, Marlow, Maidenhead, Knowl hill, Cookham, Cookham Dean, Marlow Bottom, Little Marlow, Winter Hill, Berkshire, Ascot, Holyport, Bray, Windsor, Dedworth, Rotherford peppard, Lower Shiplake, Sonning, Charvil, Twyford, Hare Hatch, Burchetts Green, Pinkneys Green, Littlewick Green, Dorney, Hedsor, Cookham rise, Flackwell Heath, High Wycombe, Speen, Naphill, Lacey Green, Chepping Wycombe, Loudwater, Beaconsfield, Seer Green, Forty Green, Knotty Green, Jordans, Hedgerley, Gerrards Cross, Camp road, Chalfonts, chalfont st Peter, Chalfont St Giles, Fulmer, Denham, Iver, Iver Heath, Wexham, Richings Park, Old Windsor, Cranbourne, Reading, caversham, Princes Risborough, Ellesbrough, Bishopstone, Stone, Aylesbury, Dinton, Cuddlington, Haddenham.
We cover all county districts Buckinghamshire, Berkshire, and Oxfordshire offering the best advice and service for Swimming pool liner installations.
http://www.deependpools.co.uk/shop/index.php?app=gbu0&ns=display&ref=contact
Deep End Pools recently embarked upon a project on a swimming pool in Ickenham Middlesex, the existing swimming pool had recently had the liner changed by a local swimming pool company in Bucks and seemingly there were some oversights!
The original swimming pool was an old Metal panel swimming pool system installed sometime in the 80’s now heading into some 30 years old the shell was showing some serious signs of wear, which we discovered upon removal of the swimming pool liner.
The swimming pool unfortunately had an incorrect backfill substance allowing the framed chassis of the swimming pool structure to be constantly in contact with moisture, this is very frustrating as the reason for the method of build in this way is simply to save costs on the build via the contractor, the end result became extremely apparent when the liner was removed the soil backfill had penetrated 2 or more swimming pool panels to the point they were split and soil was spilling into the swimming pool!
An extremely precarious situation as the ‘A’ frame braces had also suffered bad corrosion damage; the pool could collapse at any time! Further to the woes the swimming pool floor screed was heavily ingressed with algae this had penetrated through the new swimming pool liner! Less than 12 months old!
We had two options given this scenario, the pool structure was weak and at the point of collapse and the floor screed poorly laid undulating and impregnated with algae. Option 1 fill the pool in option 2 build a pool within the pool!
Option 2 was chosen
Option 2 actually worked out to be more cost effective than filling the swimming pool in due to the restricted access to the house, as the existing swimming pool was a liner hopper swimming pool and more commonly new build swimming pool construction requests are for flat bottomed constant depth pools, we opted to infill the deep end of the swimming pool and form a concrete footing ready to accept the new heat retaining swimming pool block system.
our work began stabilising the existing swimming pool structure, and then casting a concrete footing to accept the new in ground pool, once the swimming pool was up this being only in a matter of 2 days work, we began the concrete infill to the backfill section and the block internal.
Once the pool was built we set upon reshaping the swimming pool floor firstly chemically treating the existing pool floor with an antifungicide then installing a new concrete cast over the infill steel re-enforced then applying our swimming pool liner floor porous screed mix
We finished the pool top with a buff set of certikin lined coping stones 9″ and installed the liner lock ready to accept a certkin liner, to ensure the swimming pools future we installed new certikin skimmers and return fittings adjoining to the original pipe work in the ground after a successful pressure test.
Why the Form works Polystyrene pool kit?
Every new build swimming pool this season we have constructed has been a heat retaining block system the wall is softer than the typical block rendered swimming pool, the structure once full has immense strength when the concrete is in filled. Not to mention the blocks ability to retain heat within the swimming pool.
We aim to install the liner very shortly bringing this family swimming pool back to life for another 30 years!
if you are considering swimming pool depth reduction to reduce costs, or if you shell is looking a little ropey and you would like to reduce the swimming pool size and water volume and switch to an environmentally friendly system and you are located in the Buckinghamshire, Berkshire, Hertfordshire and Oxfordshire districts then why not call upon Deep End Pools and we can review your long term view on swimming pool carbon emissions and heat retaining swimming pool systems.
Call today for a free no obligation survey 01494 671787 and one of our experienced team will visit you.

Swimming pool re-build in Ickenham Middlesex












